Consequences of future management options for the Bremerhaven drainage system.
(A report to the Woongoolba Flood Mitigation Advisory Committee).
Abstract
The following questions were referred to BSES by the Woongoolba Flood Mitigation Advisory Committee: (1) The possible short and long-term effect on all classes of land of lowering the watertable in the Bremerhaven System. (2) The possible effect of the continued use of a designated part of the system for water exchange for the existing prawn farm. These questions will be answered in relation to data acquired in the area of the Bremerhaven System during the Rocky Point Watertable Study from September 1982 to July 1984, and on the basis of sill height determinations at Bremerhaven on 28\8\91 and 19\9\91.