Search
Now showing items 1-4 of 4
Develop and assess adaptability of different row spacings for harvester fronts : SRDC Grower Group Innovation Project final report
(2007)
Cutting different row widths is a piece of cake this season for a Home Hill cane harvester contractor. This project allowed an easy change of harvester front’s widths by the pull of a lever from 1.52m to 1.83m rows, which ...
A review of institutional arrangements in the Burdekin irrigation area with a view to managing sustainable farming practices in the region : SRDC Final report CG018
(2007)
In the late 1980’s the Burdekin dam commenced operation and resulted in a large area of land being
cleared and converted to irrigation. This influx of water has caused the groundwater level to rise
alarmingly over the ...
Implementation of improved sugarcane farming systems in the Clare area, Burdekin District, North Queensland : SRDC Grower Group Innovation Project Final report
(2007)
The MIG was interested to quantify the benefits of moving from their current 1.52m row configuration to a row configuration that better matches tractors, harvesters and haulage equipment using GPS technology. As a result ...
WATW? : Iterim and final report CGH001
(Sugar Research and Development Corporation (SRDC), 2007)
The primary issue that the WATW? Project addressed was lack of representation of women across all sugar industry sectors, noticeable to all observers, including Government Census 2004. This lack of women’s perspective, and ...